1. For Contractor Manufacturing:
Enter a “Part” called CUT, one called SEW, etc.
Make the Unit Value 1.000, and the Unit of Measure “$”.
Click the “For Cost Only” Checkbox.
Category should be Labor.
You might want to begin all Labor Codes with a “W” to keep them together. We use W for Work (L for Labor gets mixed with L for Labels).
On the Components window, assign the $ quantity for the correct cost.
2. For In House Manufacturing:
Enter a “Part” called CUT, one called SEW, etc.
Make the Unit Value 1.000, and the Unit of Measure “Hr”.
As above, on the Components window, assign the Hrs quantity to the item.